Sentry Sentry 2.0 Betreibershandbuch Seite 14

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 56
  • Inhaltsverzeichnis
  • FEHLERBEHEBUNG
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 13
Installation and Setup VirTis BenchTop 2K, 4K and 6K
4 Revision 004, 12/09
Vacuum Pump Installation
A remotely mounted vacuum pump is required for operation of your BenchTop freeze
dryer. The vacuum pump must be a two-stage, high-vacuum pump that does not
exceed the maximum allowable amperage listed on the unit’s serial tag and back
panel label.
The following parts are included with your BenchTop unit for connection to the
vacuum pump:
Four (4) feet of ¾-inch ID (Inside Diameter) rubber vacuum tubing
One (1) 90° rubber elbow
One (1) plastic connector
Installing the Vacuum Pump
Notes: If you are installing a previously used vacuum pump, refer to the
vacuum pump manual and the General Maintenance section of this manual.
Ensure that the pump was properly maintained prior to installation.
A vacuum pump inlet port adapter and sufficient tubing are required for
connection to the vacuum pump. If you need assistance, please contact SP
Industries.
1. Position the vacuum pump in a convenient location near the
freeze dryer. Ensure that the pump will be easily accessible
during routine maintenance.
2. Cut the supplied vacuum tubing as short as possible. Allow
enough length between the vacuum pump and the
BenchTop unit.
Note: Clamp and cut the ¾-inch ID vacuum hose. If you do not
wish to cut the hose, it may be used at its full length, but may take
up more space than necessary.
3. Locate the inlet port on your vacuum pump. Refer to the
vacuum pump manual.
4. Remove any material with the exception of the inlet filter
screen and gasket.
5. Place the adapter on the inlet port and secure with a fitting.
If an adapter is not present, contact SP Industries.
6. Remove all objects from the vacuum pump outlet port, but
retain for future use.
7. Connect the BenchTop unit to the vacuum pump using the
¾-inch vacuum tubing. If connecting to a vacuum pump
purchased from SP Industries, attach the ¾-inch tubing from
the BenchTop to the vacuum pump intake nipple, add a tubing clamp and
tighten securely.
Vacuum pump
8. Check the vacuum pump oil level. The oil level should read half way up the
sight glass. Add oil only if necessary. DO NOT OVERFILL!
9. Verify that the power switch on the vacuum is off. The LED next to the VAC
button on the unit’s front panel must be off.
© SP Industries, Inc. 2009
Seitenansicht 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 55 56

Kommentare zu diesen Handbüchern

Keine Kommentare